In brief
A single final delivery date provides little warning when a package is falling behind. Milestones should reveal progress through approvals, procurement, fabrication, and dispatch.
A single final delivery date provides little warning when a package is falling behind. Milestones should reveal progress through approvals, procurement, fabrication, and dispatch.
A single final delivery date provides little warning when a package is falling behind. Milestones should reveal progress through approvals, procurement, fabrication, and dispatch.
For each service measure, write the start event, stop event, data source, reporting owner, and agreed exclusions. Choose a target with the supplier that reflects the operating need and available evidence; the target is a commercial proposal, not an industry-wide standard. Explain how disputed records will be resolved and when a recurring problem must be escalated.
Run the measure through one ordinary event and one exception before signing. If the two parties calculate different results from the same facts, refine the definition. A short set of observable commitments is easier to manage than a long list that nobody can verify.
Consider this hypothetical example.
A supplier reports fabrication as mostly complete, but a critical component has not been ordered. Ask for milestone evidence tied to drawings, material availability, production stages, and inspection release. A percentage alone may hide the item that controls the finish date. Review buyer approvals at the same time so supplier delay is not confused with a pending design decision. The programme discussion should identify the next constraint and a realistic recovery action.
Use milestone evidence to address delay causes while recovery options still exist.