Skip to main content

United Arab Emirates · Energy, Power And Electrical

1: Installation Of Ev Charger At Aerospace 01 - 1 Ea 2: Installation Of Ev Charger At Aerospace 02 - 1 Ea 3: Installation Of Ev Charger At Aerospace 03 - 1 Ea Response Currency: Aed Closing Date/time: 15/09/2026 14:00

Dubai South

Expired

Tender summary

1: Installation Of Ev Charger At Aerospace 01 - 1 Ea 2: Installation Of Ev Charger At Aerospace 02 - 1 Ea 3: Installation Of Ev Charger At Aerospace 03 - 1 Ea Response Currency: Aed Closing Date/time: 15/09/2026 14:00. Published by Dubai South in United Arab Emirates. Category: Energy, Power And Electrical.

Buyer
Dubai South
Country
United Arab Emirates
Category
Energy, Power And Electrical
Closing date
15 September 2026
Updated
12 September 2026