Skip to main content

United Arab Emirates · Environment And Pollution

1: Saw Cutting The Asphalt Surfacing 180mm Depth As Per Drawings units: M - 30 Ea 2: Removal Of Existing Hump And Disposal As Construction Waste units: Sqm - 150 Ea 3: Remove Existing Asphalt Surfacing 180mm Depth And Dispose To Dumping Yard Across The 3

Dubai South

Expired

Tender summary

1: Saw Cutting The Asphalt Surfacing 180mm Depth As Per Drawings units: M - 30 Ea 2: Removal Of Existing Hump And Disposal As Construction Waste units: Sqm - 150 Ea 3: Remove Existing Asphalt Surfacing 180mm Depth And Dispose To Dumping Yard Across The 3. Published by Dubai South in United Arab Emirates. Category: Environment And Pollution.

Buyer
Dubai South
Country
United Arab Emirates
Category
Environment And Pollution
Closing date
14 September 2026
Updated
12 September 2026