Skip to main content

United Arab Emirates · Construction & facilities

Construction Supervision for 4 Stormwater Projects in UAE

Buyer not disclosed

Active

Tender summary

This contract covers construction supervision for four stormwater projects in UAE. These projects include a stormwater pond and drainage systems connecting Al Maktoum Airport and Dubai South, a drainage system on Sheikh Zayed Bin Hamdan Road, and connections to stormwater networks in Dubai Land. The supervision requires a core team with specific roles, including Public Relations Coordinator, Senior Project Controls Engineer, Senior Civil Engineer, Geotechnical Engineer, NOC Engineer, Traffic Engineer, Contracts Administrator, and Resident Engineer. The deadline for submissions is 2026-10-29.

Tender Overview

This contract covers the construction supervision of 4 projects.

The tender is located in AE.

Payments will be in AED.

Project Scope and Supervision Roles

The contract will cover the construction supervision of 4 projects.

Specifically, these projects are:

  • Project (1): TF-06-C1: Construction of stormwater pond connecting Al Maktoum Airport and Dubai South.
  • Project (2): TF-06-C2: Construction of stormwater drainage system connecting Al Maktoum Airport and Dubai South.
  • Project (3): TF-07-C1: Construction of stormwater drainage system on Sheikh Zayed Bin Hamdan Road connecting developers.
  • Project (4): TF-24-C1: Connecting developers’ areas to the stormwater networks in Dubai Land.
  • Supervision of the works is described in stage 7 (reference clause 3.1.1.7).
  • The schedule of payments is based on position rates.
  • The core team positions include: Public Relations Coordinator (local-emirati), Senior Project Controls Engineer, Senior Civil Engineer, Geotechnical Engineer, NOC Engineer (Emirati local), Traffic Engineer, and Contracts Administrator.
  • All other services required for efficient supervision during the construction stage and any required staff not mentioned in the schedule will be considered as office back-up (refer to clause 3.1.17 GCCSA).
  • Full-time work is up to 08 hours per day; part-time work is up to 4 hours per day.
  • A Resident Engineer position is also mentioned in the schedule of payments.

Submission Deadline

The deadline for submissions is 2026-10-29 at 08:00 local time.

Buyer
Not disclosed
Country
United Arab Emirates
Category
Construction & facilities
Closing date
29 October 2026
Updated
20 October 2026