United Arab Emirates · Industry

Supply And Replacement Of Wire Rope, Load Testing And Certification For 44t Gantry Crane At ''k'' Station Phase 2 Desalination Plant. The Work Includes Removal Of Existing Wire Rope, New Installation, Cleaning Of Drum And Hoist Drive Unit, Load Test, And

DUBAI ELECTRICITY & WATER AUTHORITY (DEWA)

Expired

Tender summary

Supply And Replacement Of Wire Rope, Load Testing And Certification For 44t Gantry Crane At ''k'' Station Phase 2 Desalination Plant. The Work Includes Removal Of Existing Wire Rope, New Installation, Cleaning Of Drum And Hoist Drive Unit, Load Test, And. Published by DUBAI ELECTRICITY & WATER AUTHORITY (DEWA) in United Arab Emirates. Category: Industry.

Buyer
DUBAI ELECTRICITY & WATER AUTHORITY (DEWA)
Country
United Arab Emirates
Category
Industry
Closing date
07 September 2026
Updated
07 September 2026