Skip to main content

United Arab Emirates · Water, Sewer, and Infrastructure

Supply of Materials Required for the Construction of an 800 mm Diameter Pumping Pipeline from the Pumping Station in Al Nahda Area to the Treatment Plant in Industrial Area 5

Buyer not disclosed

Expired

Tender summary

Supply of Materials Required for the Construction of an 800 mm Diameter Pumping Pipeline from the Pumping Station in Al Nahda Area to the Treatment Plant in Industrial Area 5. Published by a buyer not disclosed in this summary in United Arab Emirates. Category: Water, Sewer, and Infrastructure.

Buyer
Not disclosed
Country
United Arab Emirates
Category
Water, Sewer, and Infrastructure
Closing date
30 September 2026
Updated
26 September 2026